Urban Transit & Bridge

No.
Description of Project
Name of Client
Project Location
Scope of JOC Supply
Time of Completion
1
Nanjing Metro Line One (Length:21.72km)
Nanjing Metro
Nanjing, China
Procurement Operation
Sep, 2005
2
Nanjing Metro Line Two (Length:25.145km)
Nanjing Metro
Nanjing, China
Procurement Operation
Under Construction
3
Suzhou Rail Transit
Suzhou Rail Transit Co., Ltd
Suzhou, China
Procurement Operation
Under Construction
4
Nanjing Xuanwuhu Lake-floor Tunnel
Nanjing
Nanjing, China
Procurement Operation
2003
5
Nanjing No. 2 Yangtze River Bridge
Nanjing No. 2 Yangtze River Bridge
Nanjing, China
Procurement Operation
2003
6
Nanjing No. 2 Yangtze River Bridge
Nanjing No. 3 Yangtze River Bridge
Nanjing, China
Procurement Operation
Oct, 2005
7
Sutong Bridge (Crossing Yangtze River)
Sutong Bridge
Nantong, China
Procurement Operation
May, 2008

Ship-building

No.
Description of Project
Name of Client
Project Location
Scope of JOC Supply
Contract Effective Date
1
5500 DWT Product Oil Tanker (ABS Class)
N.G Livanos Maritime Co., Ltd
Greece
Engineering and Supply
Aug 16, 2005
2
5500 DWT IMO II Chemical Vessel (ABS Class)
N.G Livanos Maritime Co., Ltd
Greece
Engineering and Supply
Aug 27, 2005
3
80M Pontoon (CCS Class)
 
 
 
 
4
135M Container Vessel (BV Class)
 
 
 
 
5
72M Barge (BV Class)
 
 
 
 
6
136M Sea-Going Pontoon (BV Class)
 
 
 
Under Construction
7
135M Container Vessel (BV Class)
 
 
 
Under Construction
8
110M Barge (BV Class)
 
 
 
 
9
86M Barge (BV Class)
 
 
 
 
10
110M Oil Tanker
 
 
 
Under Construction
11
Combination Vessel (BV Class)
 
 
 
Under Construction
12
Barges (BV Class)
 
 
 
Under Construction
13
8000 DWT MPV (GL Class)
 
 
 
Under Construction

Chemical Industry

No.
Description of Project
Name of Client
Project Location
Scope of JOC Supply
Time of Completion
1
Hydro Power Plant, 2 X 800KW
The Alliance Power Nepal Pvt. Ltd
Nepa
Engineering, Equipment Supply, Supervision of Erection and Start up
Feb 16, 2005
2
Dryer Furnance for Textile, Pressure Vessel
Toray Engineering Corp.
Japan
OEM
May 26, 2003
3
Partial Equipment for Surfic Acid Project
Tonglin Copper Refinery Corp.
China
Engineering and Supply
Mar 16, 2004
4
5,500tpa TFE & 6,000tpa PTFE Plant
Gujarat Fluorochemicals Ltd.
India
Know how transfer, Basic Engineering, Priority Equipment Supply, Supervision of Erection and Start up
Jan 22, 2005
5
Vaporizer
TGE Gas Engineering GmbH
Germany
Engineering and Supply
Jul 13, 2005







Power Industry

No.
Description of Project
Name of Client
Project Location
Scope of JOC Supply
Time of Completion
1
Transformer Rectifier Group for Cloro-Alkali Project 520VDC X 16.2 KA
Gujarat Fluorochemicals Ltd.
India
Engineering, Equipment Supply, Supervision of Erection and Start up
Sep 17, 2005
2
Transformer Rectifier Group for Cloro-Alkali Project 400VDC X 16.2 KA
ASM Chemical Ltd.
Bangladesh
Engineering, Equipment Supply, Supervision of Erection and Start up
Aug 21, 2006
3
Transformer Rectifier Group for Cloro-Alkali Project 630VDC X 16.2KA
Dugarpur Chemical Ltd.
India
Engineering, Equipment Supply, Supervision of Erection and Start up
Apr 21, 2007
4
Rectifier Transformer and Saturated Reactor Control Panel 950VDC X 16.2KA & 950VDC X 66 KA
Hindalco Industries Ltd.
India
Engineering, Equipment Supply, Supervision of Erection and Start up
Jul 07, 2007
5
Transformer Rectifier Group for Cloro-Alkali Project
Meghmani Organics Ltd.
India
Engineering, Equipment Supply, Supervision of Erection and Start up
Jul 23, 2007
6
Transformer Rectifier Group for Cloro-Alkali Project 220VDC X 13.5KA
Universal Chemical Industries Ltd.
France
Engineering, Equipment Supply, Supervision of Erection and Start up
Jan 11, 2008
7
Step-up Transformer and Accessories
MAN Diesel SAS,
France
Engineering, Equipment Supply, Supervision of Erection and Start up
 
8
Regulating & Rectifier Transformer
HindalcoIndustries Limited –Hirakud Complex
France
Engineering, Equipment Supply, Supervision of Erection and Start up
 
9
Rectifier System with Transformer
Gujarat Fluorochemicals Ltd.
France
Engineering, Equipment Supply, Supervision of Erection and Start up
 

Construction Industry

No.
Description of Project
Name of Client
Project Location
Scope of JOC Supply
Time of Completion
1
125 tpd Cement Complete Plant
Kepy Cement Industries Pvt. Ltd
Nepal
Engineering, Equipment Supply, Supervision of Erection and Start up
Sep 17, 2005
2
Cranes,Ball Hook Block and Single Pulley
Sharaf Foundations
UAE
Engineering and Supply
Aug 14, 2008